1. Prepare Construction Site and Pour Foundation
- Apply for and Acquire Permits
- Construction Crew Levels Site
- Puts Up Wooden Forms for the Temporary Foundation
- Footings Are Installed
2. Complete Rough Framing
- Floor System, Walls, Roof Systems Are Completed
- Sheathing Applied to Exterior Walls, Covered With Protective Wrap
3. Complete Rough Plumbing, Electrical HVAC
- Pipes and Wires
- Sewer Lines and Vents
- Water Supply Lines
- Bathtubs, Shower Units
- Ductwork for HVAC System
- HVAC Vent Pipes
4. Install Insulation
- Fiberglass
- Cellulose
- Foam Mineral Wool
- Concrete Blocks
- Insulation Concrete Forms
- Spray Foam
- Structural Insulated Panels
- Foam Board or Rigid Foam
5. Complete Drywall and Interior Fixtures, Start Exterior Finishes
- Drywall is Hung and Taped
- Texturing is Completed
- Primary Coat of Paint is Applied
- Exterior Finishes (Brick, Stucco, Stone) Are Installed
6. Finish Interior Trim, Install Exterior Walkways and Driveway
- Doors, Window Sills, Decorative Trim Installed
- Cabinets, Vanities, Fireplace Mantles Installed
- Final Coat of Paint
7. Install Hard Surface Flooring, Countertops; Complete Exterior Grading
8. Finish Mechanical Trims; Install Bathroom Fixtures
9. Install Mirrors, Shower Doors; Finish Flooring, Exterior Landscapin g
10. Final Walk-Through
Spot items that need to be corrected or adjusted. Examine the surfaces of countertops, fixtures, floors, and walls for possible damage.