1. Prepare Construction Site and Pour Foundation

  • Apply for and Acquire Permits
  • Construction Crew Levels Site
  • Puts Up Wooden Forms for the Temporary Foundation
  • Footings Are Installed

2. Complete Rough Framing

  • Floor System, Walls, Roof Systems Are Completed
  • Sheathing Applied to Exterior Walls, Covered With Protective Wrap

3. Complete Rough Plumbing, Electrical HVAC

  • Pipes and Wires
  • Sewer Lines and Vents
  • Water Supply Lines
  • Bathtubs, Shower Units
  • Ductwork for HVAC System
  • HVAC Vent Pipes

4. Install Insulation

  • Fiberglass
  • Cellulose
  • Foam Mineral Wool
  • Concrete Blocks
  • Insulation Concrete Forms
  • Spray Foam
  • Structural Insulated Panels
  • Foam Board or Rigid Foam

5. Complete Drywall and Interior Fixtures, Start Exterior Finishes

  • Drywall is Hung and Taped
  • Texturing is Completed
  • Primary Coat of Paint is Applied
  • Exterior Finishes (Brick, Stucco, Stone) Are Installed

6. Finish Interior Trim, Install Exterior Walkways and Driveway

  • Doors, Window Sills, Decorative Trim Installed
  • Cabinets, Vanities, Fireplace Mantles Installed
  • Final Coat of Paint

7. Install Hard Surface Flooring, Countertops; Complete Exterior Grading

8. Finish Mechanical Trims; Install Bathroom Fixtures

9. Install Mirrors, Shower Doors; Finish Flooring, Exterior Landscapin g

10. Final Walk-Through

Spot items that need to be corrected or adjusted. Examine the surfaces of countertops, fixtures, floors, and walls for possible damage.